Projects Listed by Category
PROJECT Links OWNER / PROJECT MGR. DESCRIPTION OF WORK
AGRICULTURE - EQUESTRIAN STALL BARNS / HAY SHEDS
Oakley Horse Arena
Completion: 04/01/2009
O'well Precast - Dan Balls Horse Arena, 220' x 260'  (Building has concrete tilt-up walls)
Salt Lake Equestrian Show Barn
Completion:
Toby Cordova Stall Barn, 210' W x 93' L x 12'H
Mark Harding
Completion:
Mark Harding Horse Barn, 75' x 75' x 16'
WASATCH ARENA
Completion:
Dave Balls Arena, 172' W x 302' L,   Entrance Lean-to, 180' x 20',   Stock Lean-to, 122' x 20'
Building has Concrete Tilt-up Walls
AUTOBODY SHOPS
Jacks Place
Completion:
Jack Berry Autobody Shop
Monkey Lube, SPEEDCO
Completion:
Wasatch West Const. Building / Insulation / Concrete, 90' x 171' x 20',  Building with Mezzanine
OFFICES / WAREHOUSE
Rocky Mountain Waterproofing
Completion:
McKay Douglas Office & Warehouse,  150' x 175'
RMW, Westside addition
Completion:
McKay Douglas Warehouse Addition
Aramark Uniform Services
Completion:
Jim Novello Covered Lean-to, 73' x 100' x 23' / 15' X 41'
W.F. Engineering
Completion:
Ivan Radman Warehouse, 70' x 150'
Marmon Keystone
Completion:
Ray Woodard 3 Warehouses, Largest - 100' x 200' x 27'   Office Addition and Remodel, 50' x 60' x 15'
Marmon Keystone
Completion:
Ray Woodard Retro-fit Roof & Main Building, 162' x 426'
Goodfellow Corp.
Completion:
Lynn Goodfellow Warehouse, 80' x 150' x 28',  Office, 80' x 75' x 20'
Cytozyme
Completion:
Dusten Cooper Warehouse / Offices 88' x 220' x 20'
Fox Valley Leather Co.
Completion:
Scott Drollinger Cold Storage, 75' x 100'
Air Liquide / Knight West Const.
Completion:
Carl Baldwin Metal Building, 80' x 100' x 18'
Wasatch / Knight West Const.
Completion:
Carl Baldwin Metal Building, 70' x 100' x 18'
C&M Manufacturing
Completion:
Chris Farrell Structural Steel & Concrete Tilt-up, 100' x 100' x 16'  Addition, 70' x 100' x 16'
Fox Valley Leather Co.
Completion:
Scott Drollinger Mezzanine / Showroom; Structural Steel / Landing & Offices
May's Custom Tile
Completion:
Steve May Structural Steel, Concrete Tilt-up W / Metal Roof
Brookwood Cabinets
Completion:
Randy Merrick Office / showroom / Warehouse,  Concrete Tilt-up Walls and Remodel Old Blg.
Wolper Construction
Completion:
Rich Wolper Concrete / Steel Erection,  Offices / Warehouse
Larson / Knight West Const.
Completion:
Carl Baldwin Metal Building, 75' x 80' x 18'
Altair
Completion:
Peter Radman Office & Warehouse, 105' x 238' x 18'
Impact Imaging
Completion:
Paul Bower Structural Steel Warehouse & Office, 54' x 200' x 22'
Clark Wholesale
Completion:
Bob Clark Office / Warehouse / Mezzanine / Showroom, 130' x 185' x 22'
Jennmar / Summit Realty
Completion:
Gene Stewart Warehouse & Two Offices, 80' x 80' x 22'
WHITE KNIGHT Fluid Handling
Completion:
John Simmons Engineered Metal Building & Additional Remodel and Repairs
Salt Lake Mosiquito Abatement
Completion:
Sam Dicksen Structural Steel / Fabrication / Roof & Wall / Sheeting / Flashing / Windows / Vehicle Storage & Fish Ponds
Dudley Development
Completion:
Doug Greer Metal Building & CMU Walls, 63' x 138' x 24'
United Diesel
Completion:
Cameron Kallas Office / Warehouse with Concrete Tilt-up, 90' x 120',  Wash Bay 20' x 90'
Brown Strauss Steel
Completion: 09/03/2008
Al Giffin Warehouse: 135' x 442' , 3 Saw Shops: 17' x 25',  20' x 20',  25' x 20'  Office: 52' x 95'
Pacific Bridge (Brown Strauss's Old Warehouse)
Completion: 03/25/2008
Pacific Bridge - Lindon, UT Remodel Building: (Furnish & Install Schweiss Hanger Doors), (Furnish & Replace Insulation), (Furnish & Replace Roof Sheeting)
CR England Trucking
Completion:08/24/2008
Dave Arko Paintbooth Shop: 41' x 130' x 25'
Holcium
Completion:
Dave Larson Pre-engineered Metal Building
Bret Steel (Warren Energy)
Completion:
Bret Steel Pre-engineered Metal Building / Breezeway / Excavation-Concrete; 50' x 100' x 20'
SLC Jet Center
Completion:
Charlie Haas / Denver Jet Center Airport Hangar: 120' x 210' x 36' with Rolling Hanger Door
STATE & FEDERAL GOVERNMENT JOBS
Salt Lake Valley Landfill / West Wing Admin Bldg. Avalon Construction Metal Building: 20' x 50' x 20'
LCWTP (Little Cottonwood Treatment Plant) Shane Harris (Alder Construction) Building: 54' x 125', Office: 8400 sq. Ft
Hill Air Force Base
Completion:
ITSI - Shawn Sanchez Steel Buildings: (48' x 81'), (59'x 77'), (20' x 38') Building / Insulation / Concrete
Riverton City
Completion:
Brent Bennett Platform / Deck: 20' x 38'
Tooele Army Depot - Munitions Sheds, E-Corp
Completion:
Dennis Toone Supply and Erect Metal Buildings
Tooele Army Depot - Solar Wall Panels, E-Corp
Completion:
Dennis Toone Installed Solar Wall Panels on Building located at TAD
Flare Constr.(Coalville) / Kern River / Merit Energy
Completion:
Wade Simister Building / Re-Roof / Structural Steel / Re-Sheet
JLens / E-Corp
Completion:
Dennis Toone Concrete Building & Erection, Dugway, Utah: 50' x 100' x 28'
Bluebench Landfill
Completion:
Mike Nichols Steel Erection: 60' x 120' x 28' / Installed Insulation
STEEL  ERECTOR  PROJECTS  and  CONTRACTORS  WE  HAVE  SUPPORTED
CONTRACTORS  (Name) Links Address or Location
C & A Construction 3000 North University Avenue, Provo, UT 84604
Flare Construction 175 E Chalk Creek Rd, Coalville, UT 84017
Wasatch West Construction 845 N 400 W North Salt Lake, UT 84054
Knight Construction Group 3480 Highland Drive, Salt Lake City, Utah 84106
WASATCH ORNAMENTAL IRON & WELDING 500 W State Rd, Pleasant Grove, UT 84062
Bonnco Erection 654 W 9320 S, Sandy, UT 84070
Knight West Construction 451 E 1000 S #A - Pleasant Grove, UT 84062
Kay Robinson Construction 1147 North 160 East, American Fork, UT 84003
ENTELEN Design-Build 8707 S. Sandy Parkway, Sandy UT 84070
Adroit Screw Machine 3434 West 8500 South West Jordan, Utah 84088
ITSI 1122 W. South Jordan Pkwy, Suite C, South Jordan, Utah 84095
E-Corp 824 S. 400 W. STE B-137 Salt Lake City, UT 84101